Air-cooled condensers with 30% lower electricity consumption

 
 
The overall efficiency of the ACCs are optimized thanks to fully disclosed performance analyses.
All the relevant operational and environmental requirements for the ACC are holistically considered and optimized in the performance design for a 480 MW combined cycle power plant.

As an independent engineering company, Innospin has chosen to disclose the performance analysis data in order to be able to draw up an optimal ACC configuration together with the customer. The customer has reported that the ACC thereby achieved has power consumption that is 30% lower than comparable ACC projects that he has purchased as a complete item.
 
 

 
 
Application
Many ACC project are located in areas with large seasonal and daily weather fluctuations. In such projects, it is particularly advantageous to optimize the ACC together with the running concept of the overall plant and the electricity market prices.
 
 
« back to overview 
 
 
 

 
Are you interested in optimizing the performance of the ACC and in thereby increasing the overall efficiency of your power plant?

We would be happy to personally introduce you to our ACC engineering.
 