NANZHUANG air cooled condenser, Yangquan, China

 
 
The start of a new cooperation
The Nanzhuang project set an important milestone for Innospin’s activities in China, and was the start of a successful cooperation with Shouhang.
 

 
 
Project requirements
Nanzhuang was a “fast track“ project with a planned throughput time of only 15 months from the start of the project to commercial operation.

Our services
The performance and process design, the operational concept with control technology specifications, the mechanical design of all the systems and the civil engineering design under optimal utilisation of the production technology available in China.

Customer benefits
The ACC was ready for use within 15 months and achieved excellent results during the guarantee acceptance.
The power plant operator was impressed and extremely satisfied with the throughput time and the performance.

Thanks to the design and engineering work of Innospin and its Swiss partners, Shouhang successfully entered the market as an ACC general contractor in an extremely short time, and this led to numerous additional projects for Shouhang, INNOSPIN and its Swiss partners.
 
 
« back to overview
 
 
 
 
Customer
Shouhang IHW Cooling Technologies Co. Ltd., Beijing, P.R. China

Location
Yangquan City, Shanxi province, P.R. China

Year
2007 - 2008

Services
  • Design, running concept and control logic
  • Process / System design
  • Mechanical design of all systems
  • Civil engineering in concrete and steel
 
 
Further information
Please do not hesitate to contact us if you have any further questions.
 
> Contact